Projects of AO Smith

A.O. Smith Logo

Indoor Athletics Centre

Built adjacent to an existing public sports centre plus outdoor track and field facilities, this building is used by local schools in the daytime and the public in the evenings. It is hoped that these facilities will also contribute to the warm up facilities for the nearby 2012 London Olympics.

Share this article

The hot water system comprises of an SGS 60 water heater with an ITE 400 solar pre-heat vessel with 5 solar collectors on the roof, these have been tilted back as far as possible to reduce the impact on the building.

 

 

Sorry, we couldn't find any posts. Please try a different search.

Related Projects

Car wash

This Dutch car wash has several wash boxes in which people can wash their car themselves and one 33m long automatic car wash. The hot […]

High School

The new Woodchurch High School in Wirral is a school with over 1300 pupils. The school houses a farm and library. The building has specialist […]

Indoor Athletics Centre

Built adjacent to an existing public sports centre plus outdoor track and field facilities, this building is used by local schools in the daytime and […]

Mini camp site

At this recently opened mini camp site an SGE with 5 collectors and a plate heat exchanger were installed. The SGE gas-solar water heater supplies […]

Scroll to Top